Precision. In motion.

Preparing your next build.

Black Friday Sale Is Live. Save 15% Off Sitewide.

Your cart is empty

Supertech / Installation reference

Connecting rod instructions.

Rod-bolt installation, stretch measurement and original reference specifications.

Back to the resource library

Supertech recommends measuring rod-bolt stretch where the fastener length can be measured. Confirm the instructions for your exact rod, bolt, lubricant and application before using a torque or stretch specification.

01 / Installation

Measure and record bolt stretch

Supertech’s guide cites ARP’s recommendation to use a stretch gauge as the most accurate way to measure bolt preload. Measure each fastener before installation and monitor its length as it is tightened to its specified stretch.

Keep a record of every rod bolt’s length before installation and after disassembly. A permanent increase of 0.001 in or more indicates deformation and the bolt should be replaced.

02 / Installation

Original installation sequence

  1. 01

    Clean mating surfaces, the threads in the bolt hole and the bolt-head loading surface on the cap.

  2. 02

    Match the identification numbers on the cap and beam.

  3. 03

    Measure the original bolt length with a stretch gauge.

  4. 04

    Lubricate the bolt threads and under-head chamfer using the lubricant specified for the fastener.

  5. 05

    Install the bolts to the end of the threads by hand.

  6. 06

    Tighten with a torque wrench in two steps, referring to the appropriate recommended torque.

  7. 07

    Measure bolt length again and verify that stretch is correct; adjust tightening as required by the fastener instructions.

03 / Installation

Original rod-bolt reference

These are the combinations Supertech lists for each bolt, not interchangeable specifications. U.H.L. means under-head length. Verify current requirements with Supertech and ARP for your exact fastener.

Original rod-bolt reference — original source reference
Bolt diameterMaterialU.H.L.Bolt stretchTorque
5/16 inARP 2000 / 220,000 psi1.500 in0.0050–0.0055 in25–28 ft·lbf
3/8 inARP 2000 / 220,000 psi1.600 in0.0055–0.0060 in45–50 ft·lbf
3/8 inARP625+ / 280,000 psi1.600 in0.0063–0.0067 in50–55 ft·lbf
7/16 inARP 2000 / 220,000 psi1.600 in0.0055–0.0060 in65–70 ft·lbf
7/16 inARP 2000 / 220,000 psi1.800 in0.0060–0.0065 in70–75 ft·lbf

04 / Installation

Application-dependent clearances

As general guidelines, Supertech lists 0.002–0.003 in for rod bearings, 0.015–0.025 in for side clearance and 0.0001–0.0015 in for piston-pin clearance. These may vary with the application and engine-builder preference; do not use them as universal assembly values.

From Supertech’s technical library. Confirm the specifications supplied with your exact components before assembly.

All technical resourcesFind your components

Confirm the details. Build with confidence.

Need application-specific guidance? Talk to the Supertech team.

Contact Supertech