Use the specification sheet supplied with your pistons. Required clearance depends on diameter, alloy, forging type, application and operating conditions—not a single universal number.
01 / Measurement
Piston-to-cylinder-wall clearance
Measure piston diameter at the gauge point shown in the diagram and consult the sheet provided with your pistons. Full-skirt and slipper forgings, alloy and operating conditions can require different clearances.

02 / Measurement
Top-ring gap / reference factors
Supertech calculates top-ring end gap in inches by multiplying bore diameter in inches by an application factor. Convert a bore measured in millimeters to inches by dividing by 25.4.
These source factors are for reference only. Engine-manufacturer requirements, application and fuel can change the required end gap. Confirm the ring and piston specifications rather than treating the factors as universal targets.
| Source application | Bore multiplier |
|---|---|
| Street performance | 0.0045 |
| Moderate turbo / nitrous | 0.0050 |
| Drag / oval track | 0.0055 |
| Turbo / nitrous / race only | 0.0065 |
03 / Measurement
Second and oil rings
Supertech uses second-ring gap = first-ring gap × 1.25 and an oil-ring minimum gap of 0.015 in. Verify these against the instructions for your exact ring set and engine.
04 / Measurement
Wire-lock installation
Insert one end of the lock into the groove, then continue spiral-feeding it until the lock is fully seated. Confirm correct seating before proceeding.
05 / Measurement
Oil-ring installation / Subaru example
Supertech oil rings use with a rotational locking detent. Side rails have one or two tabs: one engages a piston groove, facing the side of the groove; the other tab, if present, locks the middle expander. A side rail can be used at the bottom or the top.
- 01
Install the middle expander with its end gap about 90° from the wrist-pin centerline.
- 02
Locate the upper notch in the oil-ring groove.
- 03
Install the lower side rail and rotate it until its tab enters an oil groove opposite the upper notch.
Install the top side rail the same way, rotating it until its tab drops into the locating notch. Tab layout differs between ring sets, so follow the sheet supplied with your rings.
From Supertech’s technical library. Confirm the specifications supplied with your exact components before assembly.
